Proposal Brief
Icon

Industry

Energy and Environmental

Icon

Sub Industry

Solar Power Generation (Renewable)

Icon

Deal Size

INR 36.75 - 37.5 Cr

Icon

Preferred Location

India

Icon

Region

Across India

Icon

Open for Distressed Assets

No

Target Requirement

  • The company should preferably have a project with the PPAs tied up with the CNI sector (i.e. industrial and commercial sector).
  • The minimum size (MW) of a business should be 10-30 MWp.
  • It should be a growing company.

Business Operation Information
Business Documents